PKP Svetsning logoPKP Svetsnings.r.o.

Projects

Industrial project experience across Europe

Real references from industrial welding, piping, boiler shutdown, repair and assembly work across Sweden, Denmark, Spain, Slovakia, Czechia and the European Union.

Orbital welding equipment and stainless process piping for Kalundborg Pharma
Pharmaceutical industry
Kalundborg, Denmark

Project details

Kalundborg Pharma, Denmark

Orbital welding of stainless process piping

Original project photos show stainless process piping, orbital welding equipment, stainless pipe spools, flanges, pipe bends and clean stainless welds in a pharmaceutical or hygienic process piping environment.

Location
Kalundborg, Denmark
Sector
Pharmaceutical industry
Type
Stainless process piping
Visible works
Orbital welding, workshop preparation of process piping, stainless pipe spools
Project details
Welding process
141 / TIG orbital welding
Visible components
Orbital welding head and machine, flanges, pipe bends and clean stainless welds
Boiler wall welding work during the SYSAV shutdown in Malmö
Energy / industrial boiler
Malmö, Sweden

Project details

SYSAV Boiler Shutdown, Malmö, Sweden (2024)

Boiler wall repair, welding and grinding during shutdown

Original project photos show boiler shutdown work in Malmö, including boiler wall plate repair, welding and grinding in an industrial shutdown environment, scaffold access, large steel plate sections and repaired ground weld areas.

Location
Malmö, Sweden
Year
2024
Sector
Energy / industrial boiler
Project details
Type
Boiler shutdown work
Visible works
Boiler wall plate repair, welding and grinding
Access
Scaffold access in an industrial shutdown environment
Visible components
Large steel plate sections, repaired ground weld areas and boiler wall environment
Boiler access door replacement and repair work at SYSAV in Malmö
Waste-to-energy / boiler maintenance / industrial shutdown
Malmö, Sweden

Project details

SYSAV Malmö Boiler Door Replacement, Sweden 2025

Waste-to-energy / boiler maintenance / industrial shutdown

Boiler access door replacement and repair works during a maintenance project at SYSAV in Malmö, Sweden.

Location
Malmö, Sweden
Year
2025
Industry / category
Waste-to-energy / boiler maintenance / industrial shutdown
Project details
Scope
Boiler access door replacement, door frame repair, hinge and locking bracket welding, plate repair and installation
Welding processes
141 TIG/WIG, 135 MIG/MAG
Material group
FM4
Project description
Boiler maintenance project at SYSAV in Malmö, Sweden, focused on the replacement and repair of boiler access doors. The work included removal and installation of boiler door components, repair of worn and corroded steel parts, welding of hinges, locking brackets, support plates and door frames. Welding was carried out using 141 TIG/WIG and 135 MIG/MAG processes on FM4 material group components.
Numbered membrane wall tube welds from the Halmstad boiler repair project
Energy / boiler maintenance / industrial shutdown
Halmstad, Sweden

Project details

Halmstad Boiler Membrane Wall Repair, Sweden 2024

Energy / boiler maintenance / industrial shutdown

Membrane wall repair work during a boiler shutdown in Halmstad, carried out using 141 WIG/TIG and 135 MIG/MAG processes.

Location
Halmstad, Sweden
Year
2024
Industry / category
Energy / boiler maintenance / industrial shutdown
Project details
Scope
Boiler shutdown work, membrane wall repairs, weld repairs and related boiler component work
Welding processes
141 WIG / TIG, 135 MIG / MAG
Material group
FM4
Project description
During a boiler shutdown in Halmstad, Sweden, welding and repair work was carried out on membrane walls. The scope included weld repairs, preparation and repair of selected boiler sections and related outage work. The work involved 141 WIG/TIG and 135 MIG/MAG welding processes on FM4 material group.
Hydraulic hammer replacement assembly on a boiler membrane wall in Halmstad
Energy / boiler maintenance / industrial shutdown
Halmstad, Sweden

Project details

Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025

Energy / boiler maintenance / industrial shutdown

Hydraulic hammer replacement and membrane wall repair works during a boiler maintenance project in Halmstad, Sweden.

Location
Halmstad, Sweden
Year
2025
Industry / category
Energy / boiler maintenance / industrial shutdown
Project details
Scope
Hydraulic hammer replacement, membrane wall work, support plate renovation, structural welding and piping repairs
Welding processes
141 TIG/WIG, 111 MMA electrode, 135 MIG/MAG
Material group
FM4
Project description
Boiler maintenance project in Halmstad, Sweden, focused on the replacement of hydraulic hammers on membrane walls, renovation and welding of support plates, structural modifications and related piping work. The scope included 141 TIG/WIG welding, 111 MMA electrode welding and 135 MIG/MAG welding on FM4 material group components.
Eco filter dismantling and installation works at a power plant boiler unit
Power industry / energy
Sweden

Project details

E.ON Sverige Power Plant, Sweden (2023)

Eco filter dismantling, installation, welding and lifting works

Dismantling of an old eco filter and installation of a new eco filter at a power plant boiler unit, including work at height, welding, plasma cutting and lifting of supporting structures, large pipes and container-like parts.

Location
Sweden
Year
2023
Sector
Power industry / energy
Project details
Type
Boiler / power plant eco filter project
Scope
Old eco filter dismantling, new eco filter installation, work at height
Welding works
Plates, sheets, pipe flanges, supporting steel structures, supports, brackets and tie-ins
Site works
Plasma cutting and lifting of supporting structures, large pipes and container-like parts
Welding methods
135 / 136 / 138 / 111
Photos from welding, pipe fitting and assembly works during new paper mill construction
Paper industry
Husum, Sweden

Project details

Metsä Husum Paper Mill, Sweden (2022)

New paper mill construction, welding, assembly and pipe fitting

Welding, assembly and pipe fitting works during construction of a new paper mill, including work at height, pipe welding, supports, steel structures, installation and repair work.

Location
Husum, Sweden
Year
2022
Sector
Paper industry
Project details
Type
New paper mill construction
Scope
Welding, assembly, pipe fitting, work at height
Pipework
Pipe welding with different DN and wall thicknesses
Steel works
Steel structures, supports, pipe brackets, installation and repair work
Welding methods
141 FM3/FM4/FM5 / 135 / 136 / 138 / 111
Pipe welding and repair work at Metsä Husum
Industrial / process industry
Husum, Sweden

Project details

Metsä Husum, Sweden 2022

Dismantling, repair and installation of new piping routes

Dismantling, repair and installation works on existing and new piping routes in an industrial environment.

Location
Husum, Sweden
Year
2022
Sector
Industrial / process industry
Project details
Scope
Dismantling, repair, installation and welding of piping routes
Works included
Existing piping dismantling, pipe repairs, valve connections and welded branch joints
Type
Maintenance / modification / piping works
Industrial boiler shutdown and welding maintenance works
Paper industry
Husum, Sweden

Project details

Metsä Husum Paper Mill, Sweden (2022)

Shutdown works on existing boiler

Shutdown works on an existing boiler, including welding and maintenance-related works during an industrial outage.

Location
Husum, Sweden
Year
2022
Sector
Paper industry
Project details
Type
Boiler shutdown / maintenance
Scope
Welding works, maintenance support, industrial outage works
Estrella Damm branded tank in an industrial brewery production facility
Brewery / food & beverage
Spain

Project details

Damm Estrella Brewery, Spain

Industrial brewery tank area and rooftop tank works

Project photos show an industrial brewery production facility with rooftop tanks, platforms, railings, tank fittings, valves and an Estrella Damm branded tank.

Location
Spain
Sector
Brewery / food & beverage
Type
Industrial brewery tank area
Project details
Visible site areas
Rooftop industrial tanks, platforms and railings
Visible equipment
Tank fittings, valves and Estrella Damm branded tank
Boiler cutting and repair work inside the OLO Bratislava waste incineration plant
Waste incineration / boiler maintenance
Bratislava, Slovakia

Project details

OLO Bratislava Waste Incineration, Slovakia (2024)

Boiler repair, modification and internal cutting works

Repair and modification of internal boiler parts at a waste incineration plant in Bratislava, including steel plate preparation and replacement, circular cut-out work, cutting or grinding inside the boiler and welding of inner boiler wall plates.

Location
Bratislava, Slovakia
Year
2024
Project code
FV260063
Project details
Sector
Waste incineration plant / boiler project
Type
Industrial shutdown / maintenance
Scope
Repair and modification of internal boiler parts, steel plate preparation and replacement
Works included
Circular opening cut-out work, cutting or grinding inside the boiler, welding of inner boiler wall plates
TIG welding and technical piping work during a boiler room shutdown in the Czech Republic
Boiler room / technical plant
Czech Republic

Project details

CZ Boiler Room Shutdown, Czech Republic (2025)

TIG welding, piping installation and modification works

Piping and welding works during a boiler room shutdown in the Czech Republic, including TIG welding method 141, FM3 / FM5, pipe installation and modification, flanges, valves and technical piping.

Location
Czech Republic
Year
2025
Sector
Boiler room / technical plant environment
Project details
Type
Boiler room shutdown
Scope
Piping and welding works, pipe installation and modification
Works included
Flanges, valves and technical piping
Welding method
141 / TIG, FM3 / FM5

Projects

Image gallery

The gallery uses real original site photos from selected industrial projects, documenting welding, piping, boiler, repair and assembly work as practical evidence from completed site assignments.

Orbital welding equipment and stainless process piping for Kalundborg Pharma - Kalundborg Pharma, Denmark
Kalundborg Pharma, Denmark
Orbital welding equipment and stainless process piping for Kalundborg Pharma - Kalundborg Pharma, Denmark
Kalundborg Pharma, Denmark
Orbital welding equipment and stainless process piping for Kalundborg Pharma - Kalundborg Pharma, Denmark
Kalundborg Pharma, Denmark
Orbital welding equipment and stainless process piping for Kalundborg Pharma - Kalundborg Pharma, Denmark
Kalundborg Pharma, Denmark
Orbital welding equipment and stainless process piping for Kalundborg Pharma - Kalundborg Pharma, Denmark
Kalundborg Pharma, Denmark
Orbital welding equipment and stainless process piping for Kalundborg Pharma - Kalundborg Pharma, Denmark
Kalundborg Pharma, Denmark
Orbital welding equipment and stainless process piping for Kalundborg Pharma - Kalundborg Pharma, Denmark
Kalundborg Pharma, Denmark
Orbital welding equipment and stainless process piping for Kalundborg Pharma - Kalundborg Pharma, Denmark
Kalundborg Pharma, Denmark
Boiler wall welding work during the SYSAV shutdown in Malmö - SYSAV Boiler Shutdown, Malmö, Sweden (2024)
SYSAV Boiler Shutdown, Malmö, Sweden (2024)
Boiler wall welding work during the SYSAV shutdown in Malmö - SYSAV Boiler Shutdown, Malmö, Sweden (2024)
SYSAV Boiler Shutdown, Malmö, Sweden (2024)
Boiler wall welding work during the SYSAV shutdown in Malmö - SYSAV Boiler Shutdown, Malmö, Sweden (2024)
SYSAV Boiler Shutdown, Malmö, Sweden (2024)
Boiler wall welding work during the SYSAV shutdown in Malmö - SYSAV Boiler Shutdown, Malmö, Sweden (2024)
SYSAV Boiler Shutdown, Malmö, Sweden (2024)
Boiler wall welding work during the SYSAV shutdown in Malmö - SYSAV Boiler Shutdown, Malmö, Sweden (2024)
SYSAV Boiler Shutdown, Malmö, Sweden (2024)
Boiler wall welding work during the SYSAV shutdown in Malmö - SYSAV Boiler Shutdown, Malmö, Sweden (2024)
SYSAV Boiler Shutdown, Malmö, Sweden (2024)
Boiler wall welding work during the SYSAV shutdown in Malmö - SYSAV Boiler Shutdown, Malmö, Sweden (2024)
SYSAV Boiler Shutdown, Malmö, Sweden (2024)
Boiler wall welding work during the SYSAV shutdown in Malmö - SYSAV Boiler Shutdown, Malmö, Sweden (2024)
SYSAV Boiler Shutdown, Malmö, Sweden (2024)
Boiler wall welding work during the SYSAV shutdown in Malmö - SYSAV Boiler Shutdown, Malmö, Sweden (2024)
SYSAV Boiler Shutdown, Malmö, Sweden (2024)
Boiler wall welding work during the SYSAV shutdown in Malmö - SYSAV Boiler Shutdown, Malmö, Sweden (2024)
SYSAV Boiler Shutdown, Malmö, Sweden (2024)
Boiler wall welding work during the SYSAV shutdown in Malmö - SYSAV Boiler Shutdown, Malmö, Sweden (2024)
SYSAV Boiler Shutdown, Malmö, Sweden (2024)
Boiler wall welding work during the SYSAV shutdown in Malmö - SYSAV Boiler Shutdown, Malmö, Sweden (2024)
SYSAV Boiler Shutdown, Malmö, Sweden (2024)
Boiler access door replacement and repair work at SYSAV in Malmö - SYSAV Malmö Boiler Door Replacement, Sweden 2025
SYSAV Malmö Boiler Door Replacement, Sweden 2025
Boiler access door replacement and repair work at SYSAV in Malmö - SYSAV Malmö Boiler Door Replacement, Sweden 2025
SYSAV Malmö Boiler Door Replacement, Sweden 2025
Boiler access door replacement and repair work at SYSAV in Malmö - SYSAV Malmö Boiler Door Replacement, Sweden 2025
SYSAV Malmö Boiler Door Replacement, Sweden 2025
Boiler access door replacement and repair work at SYSAV in Malmö - SYSAV Malmö Boiler Door Replacement, Sweden 2025
SYSAV Malmö Boiler Door Replacement, Sweden 2025
Boiler access door replacement and repair work at SYSAV in Malmö - SYSAV Malmö Boiler Door Replacement, Sweden 2025
SYSAV Malmö Boiler Door Replacement, Sweden 2025
Boiler access door replacement and repair work at SYSAV in Malmö - SYSAV Malmö Boiler Door Replacement, Sweden 2025
SYSAV Malmö Boiler Door Replacement, Sweden 2025
Boiler access door replacement and repair work at SYSAV in Malmö - SYSAV Malmö Boiler Door Replacement, Sweden 2025
SYSAV Malmö Boiler Door Replacement, Sweden 2025
Numbered membrane wall tube welds from the Halmstad boiler repair project - Halmstad Boiler Membrane Wall Repair, Sweden 2024
Halmstad Boiler Membrane Wall Repair, Sweden 2024
Numbered membrane wall tube welds from the Halmstad boiler repair project - Halmstad Boiler Membrane Wall Repair, Sweden 2024
Halmstad Boiler Membrane Wall Repair, Sweden 2024
Numbered membrane wall tube welds from the Halmstad boiler repair project - Halmstad Boiler Membrane Wall Repair, Sweden 2024
Halmstad Boiler Membrane Wall Repair, Sweden 2024
Numbered membrane wall tube welds from the Halmstad boiler repair project - Halmstad Boiler Membrane Wall Repair, Sweden 2024
Halmstad Boiler Membrane Wall Repair, Sweden 2024
Hydraulic hammer replacement assembly on a boiler membrane wall in Halmstad - Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Hydraulic hammer replacement assembly on a boiler membrane wall in Halmstad - Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Hydraulic hammer replacement assembly on a boiler membrane wall in Halmstad - Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Hydraulic hammer replacement assembly on a boiler membrane wall in Halmstad - Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Hydraulic hammer replacement assembly on a boiler membrane wall in Halmstad - Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Hydraulic hammer replacement assembly on a boiler membrane wall in Halmstad - Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Hydraulic hammer replacement assembly on a boiler membrane wall in Halmstad - Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Hydraulic hammer replacement assembly on a boiler membrane wall in Halmstad - Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Hydraulic hammer replacement assembly on a boiler membrane wall in Halmstad - Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Halmstad HEMM Boiler Hydraulic Hammer Replacement, Sweden 2025
Eco filter dismantling and installation works at a power plant boiler unit - E.ON Sverige Power Plant, Sweden (2023)
E.ON Sverige Power Plant, Sweden (2023)
Eco filter dismantling and installation works at a power plant boiler unit - E.ON Sverige Power Plant, Sweden (2023)
E.ON Sverige Power Plant, Sweden (2023)
Eco filter dismantling and installation works at a power plant boiler unit - E.ON Sverige Power Plant, Sweden (2023)
E.ON Sverige Power Plant, Sweden (2023)
Eco filter dismantling and installation works at a power plant boiler unit - E.ON Sverige Power Plant, Sweden (2023)
E.ON Sverige Power Plant, Sweden (2023)
Eco filter dismantling and installation works at a power plant boiler unit - E.ON Sverige Power Plant, Sweden (2023)
E.ON Sverige Power Plant, Sweden (2023)
Eco filter dismantling and installation works at a power plant boiler unit - E.ON Sverige Power Plant, Sweden (2023)
E.ON Sverige Power Plant, Sweden (2023)
Eco filter dismantling and installation works at a power plant boiler unit - E.ON Sverige Power Plant, Sweden (2023)
E.ON Sverige Power Plant, Sweden (2023)
Eco filter dismantling and installation works at a power plant boiler unit - E.ON Sverige Power Plant, Sweden (2023)
E.ON Sverige Power Plant, Sweden (2023)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Photos from welding, pipe fitting and assembly works during new paper mill construction - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Pipe welding and repair work at Metsä Husum - Metsä Husum, Sweden 2022
Metsä Husum, Sweden 2022
Pipe welding and repair work at Metsä Husum - Metsä Husum, Sweden 2022
Metsä Husum, Sweden 2022
Pipe welding and repair work at Metsä Husum - Metsä Husum, Sweden 2022
Metsä Husum, Sweden 2022
Pipe welding and repair work at Metsä Husum - Metsä Husum, Sweden 2022
Metsä Husum, Sweden 2022
Pipe welding and repair work at Metsä Husum - Metsä Husum, Sweden 2022
Metsä Husum, Sweden 2022
Pipe welding and repair work at Metsä Husum - Metsä Husum, Sweden 2022
Metsä Husum, Sweden 2022
Pipe welding and repair work at Metsä Husum - Metsä Husum, Sweden 2022
Metsä Husum, Sweden 2022
Industrial boiler shutdown and welding maintenance works - Metsä Husum Paper Mill, Sweden (2022)
Metsä Husum Paper Mill, Sweden (2022)
Estrella Damm branded tank in an industrial brewery production facility - Damm Estrella Brewery, Spain
Damm Estrella Brewery, Spain
Estrella Damm branded tank in an industrial brewery production facility - Damm Estrella Brewery, Spain
Damm Estrella Brewery, Spain
Estrella Damm branded tank in an industrial brewery production facility - Damm Estrella Brewery, Spain
Damm Estrella Brewery, Spain
Estrella Damm branded tank in an industrial brewery production facility - Damm Estrella Brewery, Spain
Damm Estrella Brewery, Spain
Estrella Damm branded tank in an industrial brewery production facility - Damm Estrella Brewery, Spain
Damm Estrella Brewery, Spain
Boiler cutting and repair work inside the OLO Bratislava waste incineration plant - OLO Bratislava Waste Incineration, Slovakia (2024)
OLO Bratislava Waste Incineration, Slovakia (2024)
Boiler cutting and repair work inside the OLO Bratislava waste incineration plant - OLO Bratislava Waste Incineration, Slovakia (2024)
OLO Bratislava Waste Incineration, Slovakia (2024)
Boiler cutting and repair work inside the OLO Bratislava waste incineration plant - OLO Bratislava Waste Incineration, Slovakia (2024)
OLO Bratislava Waste Incineration, Slovakia (2024)
Boiler cutting and repair work inside the OLO Bratislava waste incineration plant - OLO Bratislava Waste Incineration, Slovakia (2024)
OLO Bratislava Waste Incineration, Slovakia (2024)
Boiler cutting and repair work inside the OLO Bratislava waste incineration plant - OLO Bratislava Waste Incineration, Slovakia (2024)
OLO Bratislava Waste Incineration, Slovakia (2024)
Boiler cutting and repair work inside the OLO Bratislava waste incineration plant - OLO Bratislava Waste Incineration, Slovakia (2024)
OLO Bratislava Waste Incineration, Slovakia (2024)
TIG welding and technical piping work during a boiler room shutdown in the Czech Republic - CZ Boiler Room Shutdown, Czech Republic (2025)
CZ Boiler Room Shutdown, Czech Republic (2025)
TIG welding and technical piping work during a boiler room shutdown in the Czech Republic - CZ Boiler Room Shutdown, Czech Republic (2025)
CZ Boiler Room Shutdown, Czech Republic (2025)
TIG welding and technical piping work during a boiler room shutdown in the Czech Republic - CZ Boiler Room Shutdown, Czech Republic (2025)
CZ Boiler Room Shutdown, Czech Republic (2025)
TIG welding and technical piping work during a boiler room shutdown in the Czech Republic - CZ Boiler Room Shutdown, Czech Republic (2025)
CZ Boiler Room Shutdown, Czech Republic (2025)