Power industry / energy
Eco filter dismantling, installation, welding and lifting works
Dismantling of an old eco filter and installation of a new eco filter at a power plant boiler unit, including work at height, welding, plasma cutting and lifting of supporting structures, large pipes and container-like parts.
- Location
- Sweden
- Year
- 2023
- Sector
- Power industry / energy
- Type
- Boiler / power plant eco filter project
- Scope
- Old eco filter dismantling, new eco filter installation, work at height
- Welding works
- Plates, sheets, pipe flanges, supporting steel structures, supports, brackets and tie-ins
- Site works
- Plasma cutting and lifting of supporting structures, large pipes and container-like parts
- Welding methods
- 135 / 136 / 138 / 111