Membrane wall repair work during a boiler shutdown in Halmstad, carried out using 141 WIG/TIG and 135 MIG/MAG processes.

Numbered membrane wall tube welds from the Halmstad boiler repair project

Energy / boiler maintenance / industrial shutdown

Energy / boiler maintenance / industrial shutdown

Membrane wall repair work during a boiler shutdown in Halmstad, carried out using 141 WIG/TIG and 135 MIG/MAG processes.

Location
Halmstad, Sweden
Year
2024
Industry / category
Energy / boiler maintenance / industrial shutdown
Scope
Boiler shutdown work, membrane wall repairs, weld repairs and related boiler component work
Welding processes
141 WIG / TIG, 135 MIG / MAG
Material group
FM4
Project description
During a boiler shutdown in Halmstad, Sweden, welding and repair work was carried out on membrane walls. The scope included weld repairs, preparation and repair of selected boiler sections and related outage work. The work involved 141 WIG/TIG and 135 MIG/MAG welding processes on FM4 material group.

Projects

Image gallery

Halmstad Boiler Membrane Wall Repair, Sweden 2024

Numbered membrane wall tube welds from the Halmstad boiler repair project - Halmstad Boiler Membrane Wall Repair, Sweden 2024
Halmstad Boiler Membrane Wall Repair, Sweden 2024
Numbered membrane wall tube welds from the Halmstad boiler repair project - Halmstad Boiler Membrane Wall Repair, Sweden 2024
Halmstad Boiler Membrane Wall Repair, Sweden 2024
Numbered membrane wall tube welds from the Halmstad boiler repair project - Halmstad Boiler Membrane Wall Repair, Sweden 2024
Halmstad Boiler Membrane Wall Repair, Sweden 2024
Numbered membrane wall tube welds from the Halmstad boiler repair project - Halmstad Boiler Membrane Wall Repair, Sweden 2024
Halmstad Boiler Membrane Wall Repair, Sweden 2024